[57north-discuss] Engage Space Work.
Iain R. Learmonth
irl at fsfe.org
Sat May 26 09:52:43 BST 2018
Hi All,
For the lighting in the main room, the electrical installation for this
has all been worked out but the installation is not yet complete.
We now have ~smart~ lighting in the main room, currently controlled by a
~smart~ light switch mounted next to the door. We have two bulbs for the
main room though currently only a single pendant is installed.
If you do have any spare Phillips Hue bulbs/switches, then please speak up.
On 26/05/18 01:18, dococassi at boukom.com wrote:
> * finish the trunking in the main room (I think peter has taken this)
We need approx. 100m of CAT 6 to finish circuits for the main room, of
which there may be 50m approx. donation incoming from Sean. It sounds
like Sean's cable is FTP, which we might want to save for another
purpose, so if anyone has 100m of CAT 6 UTP please speak up.
So far 4 circuits have been run, with 6 left to run. We have new
faceplates and a new patch panel for terminating these which I am
donating to the space. The old patch panel will be used for the rack
upstairs. The old faceplates may be used for the dirty workshop and/or
upstairs.
Thanks,
Iain.
-------------- next part --------------
A non-text attachment was scrubbed...
Name: signature.asc
Type: application/pgp-signature
Size: 833 bytes
Desc: OpenPGP digital signature
URL: <http://lists.57north.co/pipermail/57north-discuss/attachments/20180526/7237ae2c/attachment.sig>
More information about the 57north-discuss
mailing list